Adding 1GW that runs 80% of the time with months long outages to a grid that has 10GW of power available 95% of the time and 3GW 5% of the time doesn’t fix the issue and requires charging $4000/MWh rather than merely $200/MWh to pay back your boondoggle.
All the people chanting “baseload” understand this but pretend not to.
Adding 1GW that runs 80% of the time with months long outages to a grid that has 10GW of power available 95% of the time and 3GW 5% of the time doesn’t fix the issue and requires charging $4000/MWh rather than merely $200/MWh to pay back your boondoggle.
All the people chanting “baseload” understand this but pretend not to.