• 0 Posts
  • 158 Comments
Joined 8 months ago
cake
Cake day: November 1st, 2023

help-circle






  • The Hoover Dam concrete would cure in 125 years by conventional or natural methods. Crews, however, used some innovative engineering methods to hasten the process.

    Nearly 600 miles of steel pipes woven through the concrete blocks significantly reduced the chemical heat from the setting for the concrete. Crews relied on 1,000-pound blocks of ice produced daily at the site’s ammonia-refrigeration plant.

    Would have doesn’t mean is. Source